Enterprise integration succeeds when teams agree on contracts and treat events as the system of record.
Create an event-driven fabric: standardize schemas, validate payloads, and add observability for each integration path.
With contracts-first engineering and tracing, operations become measurable and failures become diagnosable—faster.